Zrealizowane projekty Doncaster Battery Energy Storage System (BESS) Project – We support renewable power generation expansion. 29 Jun 2023 This is a 10MWh BESS project in Doncaster, Yorkshire. The site will provide a range of balancing services to the electricity grid to ensure power security, system flexibility, and support […] Czytaj dalej
Zrealizowane projekty We install our solutions in Shanghai Electric's 300MW Sujiaokong offshore wind power Project 14 Jun 2023 Rudong H5# offshore wind power project is located in the Rudong sea area of Nantong City, Jiangsu Province, the offshore distance of the site center is 48km, the planned sea […] Czytaj dalej
Zrealizowane projekty We install our solutions in the Three Gorges New Energy 400MW offshore wind power project 14 Jun 2023 The Three Gorges Yangjiang Shapa Offshore Wind Farm Project is located in the southern sea area of Shapa Town, Yangjiang City, Guangdong Province, with a planned total installed capacity of […] Czytaj dalej
Zrealizowane projekty Application of Ormazabal products in Mingyang Smart Energy 300MW offshore wind power project 01 Jun 2023 The project is located in the south sea of Nanpeng Islands, Yangjiang City, Guangdong Province, China, invested and built by CECEP Wind Power Corporation. The total installed capacity planned is […] Czytaj dalej
Zrealizowane projekty Ormazabal designs Europe's largest charging park’s connection to the grid 10 Mar 2023 Since August 2021, e-car drivers at the Sortimo Innovation Park in Zusmarshausen, Germany have been able to recharge at 72 charging points while they sip a coffee on the sun […] Czytaj dalej
Zrealizowane projekty Ormazabal supplies a first prefabricated substation to Avangrid. Compact size, automated and fully tested solution. 02 Feb 2023 The Compact Substation project is the integration of a prefabricated concrete enclosure with fully automated CGM.3 and CGM.800 switchgears, all compliant with IEEE standards. The project was designed and developped […] Czytaj dalej
Zrealizowane projekty Ormazabal provides energy distribution for a large data centre 12 Dec 2022 For a data centre to operate successfully, failure safety must be guaranteed. This is because even brief failures or fluctuations in voltage within the power grid can damage sensitive hardware […] Czytaj dalej
Zrealizowane projekty Ormazabal solution ensures reliable energy supply for food centre in Germany 12 Dec 2022 German food retailer Edeka Rhein-Ruhr is investing 100 million euros in Moers-Utfort and is having a state-of-the-art local supply centre built on a 125,000 m² site. Almost 6,000 kVA of […] Czytaj dalej
Zrealizowane projekty The first pilot of the smart transformer installed in our Ormazabal Transformer Division 12 Dec 2022 The first pilot of the smart transformer was installed in our Ormazabal Transformer Division (January 2017), one of the industrial facilities of Ormazabal (Loeches, Madrid), to keep the voltage stable and […] Czytaj dalej
Zrealizowane projekty Ormazabal meets techinical and safety standards for Giga-Yachts Shore Connection 12 Dec 2022 Ormazabal, following on from its first connection point in 2014, has successfully implemented a second connection point to the shore power system for boats over 100 m long. Connection is […] Czytaj dalej
Zrealizowane projekty Ormazabal’s local and remote control solution: A transformer substation for electric vehicle HPC station 30 Nov 2022 Within the deployment of the 400 HPC (High Power Charging) stations throughout Europe that IONITY is undertaking, this site near Prague has been decided to be the one where IONITY […] Czytaj dalej
Zrealizowane projekty Hannover’s first ultra-fast charging station goes live – A Pilot Project with Enercity 30 Nov 2022 Hanover-based energy service provider Enercity has put a total of ten charging points into operation on the premises of a restaurant, conveniently located near the A2 and B6 motorways, including […] Czytaj dalej
Zrealizowane projekty 2,4 million passengers per day enjoying Transmilenio’s electric bus depots under SITP 29 Nov 2022 Transmilenio is providing a bus rapid transit solution to 2,4 million passengers per day and serves the main arteries and points of interest of the city of Bogotá. They are […] Czytaj dalej
Zrealizowane projekty Port Augusta, a hybrid wind – solar proyect implemented in Australia 25 Nov 2022 Port Augusta Renewable Energy Park (PAREP) is Iberdrola’s first renewable energy park in Australia. It comprises of 50 wind turbines and 250,000 solar modules together with associated infrastructure, to produce […] Czytaj dalej
Zrealizowane projekty Lower Road Project, a battery energy storage solution 24 Nov 2022 Lower Road is a 10MW energy storage site in the South of England. The project was originally developed by Origami Energy and later acquired by Gore Street Energy Storage Fund. NEC […] Czytaj dalej
Zrealizowane projekty Metering solution for wind turbine applications 24 Nov 2022 Due to the new billing requirements that are requested in some specific markets for Wind Turbine applications, a MV metering solution is needed as an “add-on” to be incorporated to […] Czytaj dalej
Zrealizowane projekty Maximize integration of renewables and optimize technical losses by means of an improved control implemented on a smart transformer 24 Nov 2022 The tests were carried out at the SYSLAB laboratory of the Technical University of Denmark within the research project ERIGrid, which provides access to the leading European laboratories. It was […] Czytaj dalej
Zrealizowane projekty Non-containerised self-supporting metallic substation 24 Nov 2022 Ormazabal has engineered a metallic substation by developing a solution based on a customised enclosure with an independent lifting system, offering a differential value compared to sea containers. Self-supporting […] Czytaj dalej
Zrealizowane projekty Ormazabal’s Hydroelectric installation provides electricity to 3,700 families 24 Nov 2022 Vouvry is a municipality in the district of Monthey in the canton of Valais, in Switzerland. Historically, Vouvry has wanted to be green. In 1902, the Vouvry power plant pioneered […] Czytaj dalej
Zrealizowane projekty Ormazabal switchgears meeting the high standards required in Beijing 2022 Winter Olympic Games 24 Nov 2022 Ormazabal supplied 5 switching stations to the power distribution lines for 2022 Winter Olympic Park in Yanqing district, Beijing. This is the second time that Ormazabal has supplied its products […] Czytaj dalej
Zrealizowane projekty Ormazabal protection and automation system in a Comprehensive Reconstruction Project 24 Nov 2022 This is a renovation project belongs to State Grid and the site is located in Baijia Village, Zouping City, Shandong Province. Ormazabal supplied cgm.3 and gae switchgear, equipped with protection […] Czytaj dalej
Zrealizowane projekty Ormazabal participates in a research Project: Real-time simulation in the smart grid lab 24 Nov 2022 How does our power grid deal with fluctuating voltage from wind or solar energy? How does it behave when a large number of electric cars are charging simultaneously? At the […] Czytaj dalej